OTP roundel Origin Technical Productions title
Temporary Structures FOH & Control structures

4m x 4m 2-storey secure Control structure



OTP uses the widely acclaimed Layher scaffolding system to construct its 4m x 4m 2-storey FOH structure.

The dual-level structure allows additional scope for separating lighting, video and projection control teams.

4mx4m 2-storey secure Control structure. 4mx4m 2-storey secure Control structure. 4mx4m 2-storey secure Control structure. 4mx4m 2-storey secure Control structure. 4mx4m 2-storey secure Control structure. 4mx4m 2-storey secure Control structure. Commentary tower Layher structure. 4mx4m 2-storey secure Control structure. 4mx4m 2-storey secure Control structure.
Secure Control structures:
1/9: 4m x 4m 2-storey structure.
Secure Control structures:
2/9: 4m x 4m 2-storey structure.
Secure Control structures:
3/9: 4m x 4m 2-storey structure.
Secure Control structures:
4/9: 4m x 4m 2-storey - secure door access.
Secure Control structures:
5/9: 4m x 4m 2-storey - Lower floor interior.
Secure Control structures:
6/9: 4m x 4m 2-storey - Lower floor interior.
Secure Control structures:
7/9: 4m x 4m 2-storey - Upper floor access, hatch closed.
FOH structures:
8/9: 4m x 4m 2-storey - Upper floor outlook.
Secure Control structures:
9/9: 4m x 4m 2-storey structure.
Wyndham House, Lester Way, Wallingford, Oxfordshire OX10 9TD
Yard access from Lupton Road, OX10 9BS
Production & Hire Telephone: +44(0)1235 816497
© Origin Technical Productions Ltd
Friday 27th December 2024   7:41pm
Registered in England and Wales Company registration No.8297114
Product highlight banner
Website design,
build & hosting.
HTML5 validation icon CSS validation icon