Temporary structures
Front of House & secure Control structures
From its Oxfordshire warehouse in Wallingford, halfway between Oxford and Reading, OTP can provide a number of Layher-based structures suitable for Front of House or Control positions and built to meet a variety of technical specifications and practical requirements.
Whilst FOH positions have PVC roof and wall sheeting, Control structures are clad with the Layher Protect wall cassette system and have lockable doors in order to provide security for projectors and other equipment installed inside. Acrylic window panels can be installed as required.
Whilst minor customisations or changes in configuration are possible, the structures shown are built to drawings that have been design-checked and each has a set of structural calculations showing operational loadings, ballast and anchorage specifications.
CDM regulations
OTP complies strictly with prevailing CDM (Construction Design Management) regulations.
All OTP stages and structures are supplied complete with design check drawings and structural report as well as Risk Assessments and Method Statements for construction; a remote wind speed monitoring system where applicable; and sign-off certificates.